TowRig.com - Diesel Discussion and Tow Tech

Google
Web TowRig.com


View Full Version : Wicked Wheel


INTERCEPTOR
07-17-2005, 07:07 PM
Just wondering how long it took you to install on yor PSD.

The fisrt one on my 2001 took 4.5 hours. I did another one on my 2003 took me about 3.0 hours how about you?

SBChero
08-27-2005, 10:21 AM
im planning on getting one of these very soon. any tips?

im a seasoned mechanic on gas motors but never palyed w/ a diesel, or turbos for that matter.

coloradok5
08-27-2005, 10:40 AM
Wicked wheel??

FordCummins1
08-27-2005, 12:00 PM
Its a different impeller wheel for the compressor side of the turbocharger. This isnt much info, but just so you get an idea.

http://www.brcdieselperformance.com/wickedwheel.htm

coloradok5
08-27-2005, 01:23 PM
Ahh, learn something new everyday. waytogo

Dunks Performance
10-20-2005, 10:58 AM
first couple took about 4 hours, then we tried doing one without removing the turbo. Now we can bust them out in about 1.5hr but had to build some custom tooling.

RamJetGMC
10-21-2005, 12:30 PM
mine took 5 hrs but is was a hot day and i may have spent some time in the shade and ther was beer to :rolleyes: i allso did the x over hose at the same time that was 15 mins with the stuff out of the way